Multi Tower

Multi Tower, located on the Place De Brouckere in Brussels, Belgium.

The 19-storey office building, located in the heart of the city of Brussels, and former headquarters of the multinational Phillips in Belgium, is being refurbished with a unitised curtain wall system incorporating ceramic decorative elements. This building will serve as the cornerstone of the regeneration of a larger area of this part of the historic Centre of Brussels.

The materials and colours have been carefully selected to provide the new building with light, openness and transparency in order to alleviate the massiveness of its volume.

Location

Boulevard Anspach 1, 1000 Bruxelles

Use

Office Building

Property

Whitewood

Architect

CONIX RDBM Architects

Construction company

Cordeel Zetel Temse NV

Facade Consultant

SECO Belgium NV/SA

System

  • Doors: CS 86 HID Reynaers Aluminium Belgium
  • Unitised Curtain Wall CW 86 - EF from Reynaers Aluminium Belgium
  • Stick Curtain Wall: CW50 HI/ CW50 HI SL/ CW50 HI SC Reynaers Aluminium Belgium