Parc Central II (1)

TWO PARC CENTRAL

This is the future Two Parc Central office building, which is being built by our client Dragados SA in the 22@ district of Barcelona.

 

STRUNOR has developed an bespoke unitised curtain wall system for this project, in collaboration with our partner METRA, which will allow the incorporation of a variety of claddings, including UHPC (Ultra-High Performance Concrete).

 

The batlleiroig design is inspired by aspects of 22@’s industrial past and is designed to obtain the highest certifications in terms of sustainability (LEED Gold), employee wellbeing (WELL Gold) and technology (WiredScore Gold).

 

Once again STRUNOR will collaborate with ENAR Envolventes Arquitectónicas in this project promoted by DOSPUNTOS ASSET MANAGEMENT S.L. and  expected to be completed by the end of 2024.

varcacel

42 JOSEFA VALCARCEL, MADRID

STRUNOR will once again collaborate with architectural practice Enrique Álvarez-Sala Walther in this refurbishment of the office building at 42 Josefa Valcárcel Street in Madrid.

This will be our third project with Estudio Álvarez-Sala in Madrid in the last two years, after the office building on Avenida de Bruselas in Alcobendas and the office building on Paseo de La Castellana 44.

The façade of this refurbishment project features opaque areas clad with XLIGHT ventilated façade by Porcelanosa and vision areas implemented with Schüco’s FWS50 stick curtain wall.

 

Investor: Arima Real Estate SOCIMI SA

Architecture: Estudio Álvarez-Sala

Main Contractor: CONSTRUCÍA S.L.

Façade consultancy: ENAR Envolventes Arquitectónicas

Curtain wall partner: Schüco Iberia

Ventilated façade supplier: XLIGHT Porcelanosa

Castellana-Generali

OFFICE SPACE FOR GENERALI IN MADRID

STRUNOR will be in charge of the refurbishment of the façade of the Generali office building at Paseo de La Castellana 130 in Madrid.

In collaboration with Arup, who provides architecture and façade consultant services for the client, we will work on the existing façade, replacing it with a new one based on the stick CW60 curtain wall system and Reynaers CS77 HI openings.

This solution will provide improved performance and aesthetics to the façade, in line with the client’s aspirations.

 

Investor: Generali

Architecture: Arup

Façade consultancy: Arup

Curtain wall partner: Reynaers Aluminium

AeropuertoTenerifeSur-1100x561

SOUTH TENERIFE AIRPORT

In the coming months, STRUNOR will carry out the complete envelope works of the new link building between terminals 1 and 2 at Tenerife South Airport.

On this occasion we will collaborate with main contractor Sacyr, along with partners such as Kalzip Ltd for the roofs and Reynaers Aluminium for the façades.

The scope include the Kalzip aluminium sandwich standing seam roof and the Reynaers CW60 series curtain walls and skylights, comprising a total of 15,000m2 between the various types to be installed.

Investor: Aena

Architecture: AERTEC Solutions

Main Contractor: SACYR

Roofing partner: Kalzip Ltd

Facades Partner: Reynaers Aluminium

Victoria Regina Tower

Victoria Regina Tower

STRUNOR will deliver the unitised curtain wall facade of the Victoria Regina Tower for East Flanders inverstor Baltisse.

The 22 storeys high tower block was formerly home to the IBM headquarters in Brussels. Located in the financial district and bordering with the Botanical Gradens, the tower is currently being redeveloped to provide a high quality mixed use building comprising office space, hotel, restaurant and a penthouse bar.

Our scope comprises the complete façade, mostly unitized curtain wall featuring structurally bonded glazing and decorative elements of solid aluminium cassettes and engineered marble, materials which will also be present in the rainscreen areas.

PLANOS FACHADA.pdf

New office building in Madrid for investor Citrus Limited

Our company has been awarded the contract for the execution of the facades of the new office building in Madrid for investor Citrus Limited S.L. The project, designed by architectural practice Touza Arquitectos, is located in Pozuelo, Madrid, and consists on a single L-shaped volume to a total height of three floors plus ground floor and penthouse.

Touza Architects have designed a façade in which a wide variety of construction solutions, such as a stick aluminium curtain wall, an external skin featuring large aluminium slats, aluminium rainscreen, dry façade with sandwich panel, aluminium joinery and perforated aluminium plate cladding. Some 9,000 m2 of facade solutions conform our scope for this singular office building.

New building at 22@ in Barcelona

STRUNOR will carry out the facade works of the 36 Tangier Street building at the 22@ district of Barcelona

STRUNOR has been chosen for the execution of the office building in the 22@ in Barcelona. Once again, general contractor OHL and architectural practice Batlle i Roig have trusted our company for the realisation of the facades of their projects, on this contemporary office building for investor ESECETANGER S.L.

The works consist of the design, manufacture and installation of an inner skin of stick curtain wall characterized by the large dimensions on the glazing units in the vision areas, which will grant to the offices a great sensation of amplitude and luminosity, as well as the cladding of the spandrel areas with ceramic pieces of terracotta of large dimensions, for which it has been necessary to implement an ad hoc solution for the project.

The façade is completed with an external skin featuring a powdercoated maintenance catwalk and an external skin with bespoke extruded aluminium slats, all of the above in compliance with the highest quality standards, to achieve the WELL Building Standard certification for the building.

Agustin de Foxa 2_1

2 Agustin de Foxa

New contract in Agustín de Foxá Street.

STRUNOR has been awarded a new contract to work on the envelope of the new office building being built on Calle Agustín de Foxá in Madrid.

In the heart of the capital’s skyline, this new building has been designed by architect Pedro Sentieri for Group RKV. With this new building, the architect completes a magnificent complex in the Plaza Castilla, as he is also the designer of the two hotels that flank both sides of the Castellana at its junction with Agustín  de Foxá St..

The facade of 4-10 Agustín de Foxá will preserve the aesthetics of the adjacent buildings. It will present over 5,000 sqm of stick curtain wall with glazing bonded to a carrier frame and open joints, and incorporates some 460 windows projected windows.

 

Fiteni VII

FITENI VII BUILDING, MADRID

Refurbishment work on the Fiteni VII Building is completed.

STRUNOR has finished the works of the 1st phase of the renovation of the Fiteni VII Building in Madrid, a work that has been directed by Javier Lampreave and SML Architects and Interior Designers.

Our work has focused on providing a complete new envelope, as the existing one did not meet current energy requirements. The entire enclosure of the office building has been redesigned with new windows with high performing profiles and efficient glass, and a new ventilated aluminium composite panel facade has been created, incorporating a deeper layer of insulation.

STRUNOR has also intervened in updating the design of the façade. This intervention has given the building a much more contemporary look thanks to the varying depths of the cladding and its different finishes.

ISO 14001 CERTIFICATION

STRUNOR exceeds the requirements for ISO 14001

Sustainable management is a priority for STRUNOR and we are therefore already in possession of the quality certification that supports our environmental strategy.

With this new achievement we are demonstrating our leadership in the environmental management of our activity, which we have achieved after a profound reflection on the life cycle of our materials.

Do you want to know how important quality and safety are to us?

Consult our certifications at: http://strunor.com/en/company/