Fiteni VII

FITENI VII BUILDING, MADRID

Refurbishment work on the Fiteni VII Building is completed.

STRUNOR has finished the works of the 1st phase of the renovation of the Fiteni VII Building in Madrid, a work that has been directed by Javier Lampreave and SML Architects and Interior Designers.

Our work has focused on providing a complete new envelope, as the existing one did not meet current energy requirements. The entire enclosure of the office building has been redesigned with new windows with high performing profiles and efficient glass, and a new ventilated aluminium composite panel facade has been created, incorporating a deeper layer of insulation.

STRUNOR has also intervened in updating the design of the façade. This intervention has given the building a much more contemporary look thanks to the varying depths of the cladding and its different finishes.

ISO 14001 CERTIFICATION

STRUNOR exceeds the requirements for ISO 14001

Sustainable management is a priority for STRUNOR and we are therefore already in possession of the quality certification that supports our environmental strategy.

With this new achievement we are demonstrating our leadership in the environmental management of our activity, which we have achieved after a profound reflection on the life cycle of our materials.

Do you want to know how important quality and safety are to us?

Consult our certifications at: http://strunor.com/en/company/

FACADE REHABILITATION CASTELLANA 44

44 CASTELLANA

In STRUNOR we are proud to participate in the renovation of the office building located in Paseo de la Castellana 44, a privileged enclave in the heart of Madrid.

This project consists of a large-scale refurbishment of the existing building, merging part of the previous enclosures with new materials and also choosing avant-garde colours that give the building as a whole a very modern and renovated appearance.

Starting from a magnificent design by EAS Arquitectura in strategic alliance with AYBAR MATEOS ARQUITECTOS, STRUNOR has developed and installed an interior skin of curtain wall with double skin of buttoned glass, suspended by steel cables from the roof and intermediate walkway of aluminium.

A new enclosure that enhances the elevated prism character that does not touch the ground as it passes in front of the large pylons that hold the technical and structural plant located in the upper part.

 

Park and palace

PARK AND PALACE

New high profile residential project in the heart of Madrid.

Strunor has been awarded the contract for the execution of the glazing package of the Park and Palace project located in 15 Irun St., in Madrid. Park and palace is an exclusive residential development located in a privileged area of Madrid, neighbouring at the North with the Park of the West and the Temple of Debod and at the South with the Royal Palace of Madrid.

The build of the luxury development, designed by Olalquiaga Arquitectos, will be managed by  a joint venture between main contractors San José Group and Fatecsa. Strunor’s scope of work will consist on the design, manufacture and assembly of more than 450 windows, comprising many different typologies, as well as their associated solar protection via venetian blinds and slats.